Block drafters propose several tokens in one forward pass, before earlier target tokens are realised. Their rejection mixes two losses: missing within-block path information and imperfect modelling of observable information. Accepted length cannot distinguish them. We separate the two with an information floor, the minimum expected rejection at a specified conditioning order; rejection above this floor is the model gap. Estimating both from target rollouts across four domains, four open-weight targets, and a frontier API target yields three findings. First, the all-parallel floor reaches $0.286$ at the final slot on Qwen3-4B, limiting even the best proposal to $71\%$ per-slot acceptance. Second, one realised token removes $86$--$100\%$ of this floor, a locality also recovered by an independent mutual-information analysis. Third, current drafters remain far above their floors: the final-slot model gap accounts for $43$--$64\%$ of DFlash rejection and $85$--$92\%$ of DSpark's oracle-conditioned rejection. These findings separate the value of short-range conditioning from proposal quality.
Contrastive Decoding (CD) improves generation quality, but its amateur-model pass makes decoding expensive. Accelerating CD with speculative decoding raises a proposal-alignment question: should the contrastive signal shape the drafter, or should it remain only in verification? We study this question in the lightweight feature-level drafter regime. Two controlled diagnostics, matched Cross-alpha training and an Approximate Dual-Drafter decomposition, give the same diagnosis: contrastive-aware drafting does not consistently improve over expert-aligned drafting because the contrastive correction is usually weaker than drafter error, and reconstruction can amplify that error. We introduce Decoupled Contrastive Decoding (DCD), which drafts with an expert-aligned lightweight proposer and applies the amateur only in unchanged CD verification. Standard speculative verification preserves the vanilla-CD output distribution. Across the main 8B settings, EAGLE3-based DCD achieves average greedy speedups of 1.65 to 1.95x over vanilla CD and reduces MMLU proposal-path latency by about 5 to 12x relative to amateur-coupled proposal paths.