Mohammed Basharath Ullah, Summaiya Unnisa Begum, Mohammed Nadeem Ullahcs.AI cs.LG
Data centers are increasingly optimized by artificial intelligence and, at the same time, increasingly loaded by it. The literature treats these as two unrelated problems: control studies model workload as an exogenous arrival process, while sustainability studies model infrastructure as a fixed multiplier. We screen roughly 194 papers retrieved through a documented protocol, code 63 of them, and report what the coding shows. Of 28 primary control-oriented studies, 18 are validated in simulation alone and 5 reach physical hardware or a production facility; none account for water withdrawal, and none account for embodied carbon. Reported savings intervals across four technique families overlap almost completely, which means the field cannot presently rank its own methods. Ten recurring gaps are scored for consequence and tractability, and we set out CLEAR-DC, a framework coupling a control-policy branch to a workload-demand branch through an explicit elasticity term, reads out net rather than direct benefit, and emits a schema-conformant record covering energy, carbon, water, embodied share and validation venue. The framework is an architectural and methodological proposal, not a trained system; the contribution we defend empirically is the corpus analysis and the reporting schema derived from it. Coding sheet, derived statistics and all result artifacts: https://github.com/Kimalice/AI-for-Energy-Optimization-in-Data-Centers-Closing-the-Optimizer-Load-Loop
Soham Ghosh, Nabil Mohammed, Mohammad Ashraf Hossain Sadieess.SY cs.AI
As hyperscale and colocation AI data centers continue to expand, the electric grid is increasingly required to support large, concentrated loads, with individual facilities ranging from 500 MW to 2 GW. Current projections estimate that approximately 50 GW of AI data center capacity will require grid connectivity in the United States by 2030. While prior research has extensively examined the environmental and operational impacts of AI data centers, as well as their potential role as grid-interactive assets, limited attention has been given to the challenges associated with their scalable deployment through engineering, procurement, and construction (EPC) processes. This manuscript addresses this gap by proposing a phased development framework for AI data center expansion. The approach is designed to enable developers to meet aggressive time-to-market objectives while navigating multi-year constraints associated with interconnection approvals and lead times associated with the procurement of component equipment. A modular construction architecture is presented, along with a detailed analysis of integrated energy systems and the role of hybrid on-site generation in supporting incremental capacity growth. Electromagnetic transient simulations (EMT) are used to evaluate system performance, demonstrating that a combination of on-site natural gas generation and grid-forming energy storage can reliably support data center operations during early and intermediate deployment phases. The study further examines the transition to full grid interconnection, including the capability of the data center to operate in islanded mode during grid disturbances. Finally, the manuscript compares grid-forming control strategies for system reconnection and restoration under varying conditions.
This paper evaluates whether large-scale AI data centers deployed in low-Earth orbit (LEO) could become a cost-effective alternative to terrestrial facilities. The analysis compares orbital and ground-based systems across launch cost, power generation, cooling, radiation exposure, and atmospheric reentry, as well as compute-network performance. A key distinction is the shift from terrestrial Clos networks to space-based mesh networks using laser inter-satellite links. Using bisection bandwidth, bisection intensity, and roofline-style models, we show that while LEO-based inference may be feasible, training frontier-scale LLMs in orbit is unlikely to be competitive with terrestrial data centers.
Chris Williams, Philip Colangelo, Ayse Coskun +15cs.DC cs.AI cs.PF eess.SY
The rapid expansion of artificial intelligence (AI) infrastructure is driving unprecedented growth in electricity demand from data centers. Traditional power-system planning treats large computing facilities as inflexible peak loads, leading to costly infrastructure upgrades and long delays in grid interconnection. Recent work has shown that AI clusters can reduce electricity consumption during peak demand through software-based workload orchestration. This article explores how modern GPU-based AI data centers can operate as grid-interactive assets that respond dynamically to power system conditions. We describe an architecture integrating grid signals, workload scheduling, and power telemetry for fine-grained cluster power control. Experimental results from a real-world deployment on a 130 kW GPU cluster demonstrate multiple forms of flexibility, including rapid load reduction, sustained curtailment, and carbon-aware operation while preserving service levels for priority jobs. We further demonstrate performance-aware load shifting across geographically distributed clusters, enabling workloads to migrate toward regions with lower grid stress. Together, these capabilities transform AI infrastructure from static electricity consumers into flexible resources that support grid reliability, accelerate interconnection, and improve computing sustainability.
Water use by data centers is routinely reported as a single footprint, but water is consumed through two physically distinct pathways: at the site for cooling and in the power system that generates electricity. We mapped both pathways for 472 U.S. hyperscale facilities by linking facility locations to electricity regions, hydrologic basins, and water-stress data. Under baseline assumptions, operational water consumption totals approximately 300 GL yr^-1 (range 205-451 across scenarios), with electricity-related water contributing three-quarters of the total. The two pathways produce different hotspot geographies: direct cooling burdens concentrate in stressed western and south-central basins, whereas electricity-related burdens concentrate in a few eastern grid regions with fossil-heavy supply. Just 3 of 24 hosting balancing authorities account for 59% of electricity-related water. Separating pathways identifies which decisions matter where: cooling design and water sourcing locally, electricity planning and procurement regionally
The rapid proliferation of hyperscale data centers (HDCs) in the US, mainly driven by the adoption of artificial intelligence, has raised concerns about this industry's environmental footprint. We compiled facility-level information on 403 US hyperscale data centers operating between May 2024 and April 2025 and estimated their electricity consumption, electricity sources, and attributable CO2 emissions. Across different facility-load scenarios, these HDCs consumed approximately 68-99 TWh of electricity and were associated with about 37-54 million metric tons of CO2. Under the central scenario, HDC electricity demand corresponded to approximately 1.8% of total US electricity consumption, with roughly 54% of attributed generation supplied by fossil-fuel sources. The HDC electricity-weighted average carbon intensity was approximately 545 gCO2/kWh, about 48% above the contemporaneous US national grid-average carbon intensity of 370 gCO2/kWh. Our approach provides an attributional tool for assessing the environmental footprint of hyperscale data centers using the most recent EPA eGRID plant-level data.